← Table of contents
ASCE 1193, The 4th article from the June, 1911, Volume LXXII, Transactions of the American Society of Civil Engineers. Paper No. 1193, Feb. 1, 1911

Changes To This Document

Reading edition

Transcriber's Note: The table of contents has been added. Blank pages have been deleted. Illustrations may have been moved. Discovered publisher's punctuation errors have been corrected. Some wide tables have been re-formatted to narrower equivalents with some words replaced with commonly known abbreviations and possibly a key. Some ditto marks have been replaced with the words represented. In addition, the following changes or corrections were made: p. 501: but the tampers had had[del 2nd had] previous experience p. 508: shown on Plates VI to IX[VI, VII, VIII, IX[to accomodate links]] p. 516: at this place there is a considererable[considerable] area p. 538: based on the following rates and and[del 2nd and] percentages p. 579: by crossing the river, build-the[building the] reservoir p. 550: [For Table 14: added "Total materials cost"] p. 566: respectively (Fig. 5)[(Fig. 4)], together with lack of p. 584: [Table 17 renamed to Table 18 to avoid duplication.] p. 584: Table 17[18], compiled by the writer, shows how very extreme

Start of text.

Explore with AITake your curiosity a little further.

Reading settings