← Table of contents
International Bridge Authority, Sault Ste. Marie

Front matter

Reading edition

The International Bridge Authority is a board composed of members from the Province of Ontario and the State of Michigan. Its purpose is to oversee management and operation of the International Bridge.

For information, write to: P.O. Box 317 Sault Ste. Marie, MI 49783

Sault Ste. Marie Bridge
Sault Ste. Marie Bridge

1

BRIDGE FACTS

Name: The Sault Ste. Marie International Bridge

Length: Total maintenance length from American and Canadian approaches—2.8 miles.

Cost: $20,000,000.

Designers: Steinman, Boynton, Gronquist & London, New York.

Construction: Started September 16, 1960. Opened to traffic October 31, 1962.

Width: 28 foot roadway between curbs, providing 14 foot traffic lanes in each direction.

Tolls: $1.50 each way for passenger cars. No extra charge for passengers. Canadian money accepted at par.

Height: Roadway is 145 feet above ground level at its highest point.

Clearance: Bridge has 124 feet minimum vertical clearance above low water in ship canals.

Weight: 125,000 tons of which 114,000 tons are concrete and 11,000 tons are structural steel.

Colors: Green and ivory.

Speeds: Maximum 30 miles per hour.

2

Explore with AITake your curiosity a little further.

Reading settings