Note 55 — Chapter IV · San Francisco After the Fire.

Reading edition

The loss included $25 damage to two engines which cost new $24,000; $2,000 damage to six boilers, new cost $30,000; $210 water-tank, cost new $350; $500 damage to pipes, valves and fittings, which cost new $10,500; material in store-room worth $2,000, a total loss; $4,800 loss of two tension carriages used for taking up slack of the cable. These tension carriages could very easily have been restored. This loss, $4,800, and the $2,000 stock loss, deducted from the total of $9,375, leaves a total loss of $2,575 to the machinery of a plant estimated to have cost $115,842.