Note 14 — THE SAVING OF THE VALLEY
Reading edition
Where the soil, on the site of a proposed levee, is loose and porous, so that water percolates rapidly through it, a “muck-ditch” is dug, to a depth of six or eight feet; material of more solid consistency is packed into it, and the levee is then built on the impervious foundation.