Note 113 — Chapter VII · RAILWAY BRIDGES AND VIADUCTS.
Reading edition
The difficult operations of floating and lifting the superstructures of the Chepstow and Saltash bridges were carried out entirely by Mr. Brunel and his assistants, there being no contractor engaged in, or responsible for, the work in either case.