Note 49 — PART I SPECIFICATIONS FOR STREET ROADWAY PAVEMENTS (continued 2)

Reading edition

If the joints are to be filled with bituminous cement, substitute for sections 90 and 91 the following:

Directly after the completion of the rolling and ramming, all the joints in the brick pavement and between it and the curbing, manholes or other structures, shall be filled with a bituminous cement in the following manner:

The bituminous cement shall be composed, by weight, of one hundred (100) parts of straight-run coal-tar pitch commercially known as number four and twenty (20) parts of refined Trinidad asphalt melted and thoroughly mixed together at a temperature of about 350° F., to which shall be added twenty (20) parts of dry Portland cement, which shall be thoroughly incorporated with the hot bitumen until a homogeneous mass is produced, and kept agitated so as to prevent settlement or separation until the cement is used. If another asphalt is used instead of Trinidad the quantity added to the pitch must be sufficient so that the cement will not flow at a temperature lower than one hundred and twenty-five degrees Fahrenheit (125° F.). This cement while at a temperature of about 325 degrees F. shall then be poured from a spouted vessel into all joints and vacancies in the pavement until they are completely filled, repouring being resorted to if necessary to accomplish the complete filling of the joints. After the joints are thus filled a layer of sand one-half inch thick will be spread over the whole surface of the pavement and allowed to remain until the engineer shall direct its removal.

Explore with AITake your curiosity a little further.

Reading settings