Note 25 — Introductory material (continued 4)
Reading edition
By act of May 22, 1628, it is ordered that there be paid to Adam Clippens, Engineer, who built the mud mill, a sum of 100 florins for the bid which he presented.
Reading edition
By act of May 22, 1628, it is ordered that there be paid to Adam Clippens, Engineer, who built the mud mill, a sum of 100 florins for the bid which he presented.