← Table of contents
Rambles on Railways

Note 94 — Chapter IX

Reading edition

Perhaps there is an additional reason of more or less weight for urging on the early construction of at least the section of the Euphrates Valley line from the Mediterranean to navigable water on the Euphrates. If the Isthmus of Suez Canal be completed, France will, in all likelihood, hold the keys of it—a very dangerous fact for England in case of war between the two countries. That the canal will be finished seems more than probable. Mr. Daniel A. Lange, the English representative and director of the company for its construction, in his published letter of the 2nd of November, 1867, says that “by the last official reports from Egypt, there remained on the 30th of September last 44,000,000 cubic metres of earthwork to be done. During the month of September 1,342,000 cubic metres have been excavated, the highest figures as yet obtained, and this work has been performed with only forty-three dredging machines, thus leaving, at the same rate, on the 1st of January next, 40,000,000 cubic metres for excavation, the original total required to be removed being 74,000,000 cubic metres. When the full complement of seventy-eight dredging machines now being fitted up on the spot is in working order, it may readily be calculated that the returns will show a result of at least two millions of cubic metres per month, which, in other words, means that the time required for completing the entire earthworks of the Suez Canal will not exceed twenty months from the present time. The construction of the jetties at Port Said is being pushed forward with similar rapidity. The manufacture of blocks on the spot during the month of September amounted to 9,472 cubic metres, which, together with those already made, gives a total of 164,031 cubic metres, leaving 85,969 to be manufactured, the total required for both the jetties being 250,000 cubic metres. The entire quantity already sunk in the sea at the end of September amounted to 142,776 cubic metres; remained to be immersed, 107,224 cubic metres—total, 250,000 cubic metres for both jetties. Taking 6,000 cubic metres per month, both the jetties will be completed in eighteen months from the present time. It may not be out of place to mention that these so-called blocks weigh about twenty tons each.” Mr. Lange concludes thus:—“Having said thus much on the subject of the progress of the Suez Canal works, I trust I may be permitted to add, that the time is near at hand when these gigantic works will be completed for the benefit of all nations, as by means of them the passage from sea to sea will be secured for the largest ships.”

Explore with AITake your curiosity a little further.

Reading settings