Note 49 — Chapter IV · The Punjab Triple Canal Project.[41]
Reading edition
Not printed. The area is the total rabi area less the area which is to receive only first waterings.
Reading edition
Not printed. The area is the total rabi area less the area which is to receive only first waterings.