Note 3 — Chapter V
Reading edition
This was not finished till 793. The original structure cost 80,000 dinars. Several Khalifs added to it, and Hakem II. (961-976) alone spent on it 160,000 dinars.
Reading edition
This was not finished till 793. The original structure cost 80,000 dinars. Several Khalifs added to it, and Hakem II. (961-976) alone spent on it 160,000 dinars.