← Table of contents
Argentina

Note 144 — Chapter XXI · THE PARANA, ROSARIO, AND SANTA FÉ

Reading edition

"The new port at Rosario is admittedly no improvement on the old system of delivering wheat by shoots from the barrancas down to vessels moored to wooden stages in deep channel. In a word, the means of access from shore to river are most permanently effective when capable of adaptation to the shifting character of the stream" (W. S. Barclay, Geog. Journ., Jan., 1909). "The works at the present time are sufficiently advanced to provide berths for some 15 vessels. A channel of sufficient breadth all along the frontage has been dredged so that large vessels drawing 24 feet or more can now manœuvre without stranding on sand or mud banks, as was formerly the case. The entire port can provide loading berths for about 40 vessels and for 20 to 25 vessels to discharge. The change that has been effected along the river frontage in the short space of four years is remarkable, and when the works are completed Rosario will possess one of the best ports in the country, with excellent storage accommodation attached. The contract price for constructing the port was fixed at 60,000,000 fr., but a much larger sum will have been expended before completion, exclusive of grain elevators and other works which the Company is undertaking estimated at 17,000,000 fr." (Consular Report, July, 1908). [144]

Explore with AITake your curiosity a little further.

Reading settings